Not that he was rock-n-roll, but the situation with Sinatra was similar. He was still performing way past his prime and the word was not to go see him unless you just really loved Sinatra and were not expecting him to sound like he did at his peak. Plus he forgot the words a lot too !
Official 4/1 Rosemont Meetup/Review Thread
Collapse
X
-
Dave still puts on one hellava show....i can overlook the weak vocals...cause he makes up for that with his stage presence...i just hope he doesn't damage his pipes..rock on DDComment
-
Not that he was rock-n-roll, but the situation with Sinatra was similar. He was still performing way past his prime and the word was not to go see him unless you just really loved Sinatra and were not expecting him to sound like he did at his peak. Plus he forgot the words a lot too !Comment
-
Between a Roth and a Hard Place...Comment
-
While there was a bit of a breeze on the floor, it would have been simple enuff for someone to check it out before the show or for DLR to go over to the side of the stage to tell them to shut it off. Instead, he makes a production of it seemingly every show so it’s got to be part of the act—that or someone really needs to be kicked off the road crew.Comment
-
Is it possible that the blower issue has to be handed off to union folks, and they are just used to having it on for shows?
Oh dear.
Comment
-
I would think the building crew is in charge of the building heat. Hey Dave tell them to shut it off before the show !! Hope the break helps his voice rest.Comment
-
YES! Big River should be in the set. Would love for them to add a real encore after Jump by having them come back out again for Big River.My karma just ran over your dogma.Comment
-
With the stage area packed with a ton of electronics and all of those heat producing lighting rigs... odds are the automated control systems are working over-time to maintain that section of the venue at it's desired temperature. Thus the dreaded, evil blowers...
For these automated systems it's not a matter of someone going and adjusting a thermostat or flipping a switch... some one has to go to the control center and override the programmed settings for that specific area. That may or may not be a quick fix if the building maintenance staff are not on-site or the guy with the password to access the main computer controls...
Now if it's blowers built into the stage setup... then it's a whole different matter and whoever is managing the road crew needs to walk bow-legged for a bit until resolved. I still say it's more schtick than anything... but who knows..?"If you want to be a monk... you gotta cook a lot of rice...”Comment
Comment